Categories: Sports

Problems with construction work: A lot of fuss about the implementation of the Matterhorn descent

class=”sc-29f61514-0 icZBHN”>

1/5
Construction work on the ski slope in Zermatt is in full swing.

Fuss about the Matterhorn descent!

On Monday, reports in the French media sent ski fans into an uproar. At this point the organizers dumped snow on the glacier to get the slope ready for racing.

According to the reports, there was an accusation that excavators were destroying the Theodul Glacier in Zermatt for the World Cup ski races and digging into the ice. It was also said that organizers would build the ski slope outside the permitted perimeter.

More skis
Deflowering the mega jump
Swiss downhill skiers write ski history during training!
Another 20 days until the FIS inspection
Is the premiere of the Matterhorn descent in danger?
Three weeks ago
Swiss downhill skiers race over the Matterhorn jump for the first time

Outrage about the committee’s decision

A decision by the Cantonal Building Committee (KBK) of Valais, which was made public on Thursday, now adds fuel to the fire. It states that all work outside the planned ski slopes must be stopped immediately. This means: if parts of the ski slope are actually not in the originally planned area, they are no longer allowed to be built – and the upcoming World Cup races could not take place in mid-November.

The Zermatt organizing committee responded immediately to the increasingly loud accusations and the building committee’s decision on Thursday. “We are pleased with the decision to stop work outside the approved ski area.” It further states: “We remain convinced that no work has been carried out outside the ski sports area.”

Don’t race in danger

The building committee said in its decision that they would soon take a photo on site to check the situation. Those responsible for Zermatt are not afraid that parts of the track are outside the homologated area.

Advertisement

«The races on the Matterhorn are in no way in danger. Preparation has been completed on the Swiss side in the ski sports zone and is ready to race. The planned training sessions will start as planned from next Sunday,” the press release said.

This means that the departures of 11/12 will be postponed. November (men) and 18/19. November (women) will take place as planned according to current evidence. (par/mwp)

Source : Blick

Share
Published by
Emma

Recent Posts

Terror suspect Chechen ‘hanged himself’ in Russian custody Egyptian President al-Sisi has been sworn in for a third term

On the same day of the terrorist attack on the Krokus City Hall in Moscow,…

1 year ago

Locals demand tourist tax for Tenerife: “Like a cancer consuming the island”

class="sc-cffd1e67-0 iQNQmc">1/4Residents of Tenerife have had enough of noisy and dirty tourists.It's too loud, the…

1 year ago

Agreement reached: this is how much Tuchel will receive for his departure from Bayern

class="sc-cffd1e67-0 iQNQmc">1/7Packing his things in Munich in the summer: Thomas Tuchel.After just over a year,…

1 year ago

Worst earthquake in 25 years in Taiwan +++ Number of deaths increased Is Russia running out of tanks? Now ‘Chinese coffins’ are used

At least seven people have been killed and 57 injured in severe earthquakes in the…

1 year ago

Now the moon should also have its own time (and its own clocks). These 11 photos and videos show just how intense the Taiwan earthquake was

The American space agency NASA would establish a uniform lunar time on behalf of the…

1 year ago

This is how the Swiss experienced the earthquake in Taiwan: “I saw a crack in the wall”

class="sc-cffd1e67-0 iQNQmc">1/8Bode Obwegeser was surprised by the earthquake while he was sleeping. “It was a…

1 year ago